Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

Architectural Mailbox Lunada - 2450

Item SKU # Architectural Mailbox 2450

$93.94

Availability: In stock

* Required Fields

Product Information


  • Body: 20 Gage (1mm) Galvanized Steel Sheet.
  • Roof: 10 Gage (3.5mm) Galvanized Steel Sheet.
  • Incoming Slot: 20 Gage (1mm)Galvanized Steel Sheet.
  • Access Door: 20 Gage ( 1mm) Galvanized Steel Sheet.
  • Assembly Hardware: Aluminum Hinge Pins, Stainless Steel Screws And Aluminum Rivits.
  • Lock: Stainless Steel Scalped Cam Lock With Zinc Die Cast Cylinder.
  • The Lunada Mailbox Is Assembled Primarily By Welding. The Front Bottom Corners Are Strengthened By Decorative Corner Guards Attatched With Small Screws. The Roof Is Attatched To The Body By Means Of Corrosion Resistant Screws.
  • All Installation HardWare And Instructions Are Included.
  • Product Specifications

    Brand Architectural Mailboxes

    Product Tags

    Use spaces to separate tags. Use single quotes (') for phrases.

    Write Your Own Review

    You're reviewing: Architectural Mailbox Lunada - 2450

    Estimate lead time for the following brands

    Allied Brass     7 Days       |       Elkay USA     5-7 Days       |       LaToscana     2-3 Days  
    Alno     2-3 Days       |       Empire Industries     5-7 Days       |       Laurey     2-3 Days  
    Amba     2-3 Days       |       Emtek     5-7 Days       |       Lenova     2-3 Days  
    Amerec     5-7 Days       |       Fluid     2-3 Days       |       Liberty Hardware     2-3 Days  
    Amerock     2-3 Days       |       Franke     2-3 Days       |       Maax     10-20 Days  
    Anne At Home     7-10 Days       |       Gatco     5-7 Days       |       Mico Designs     2-3 Days  
    Aquabrass     5-7 Days       |       Geberit     5-7 Days       |       Mountain Plumbing     2-3 Days  
    Aquadis     5-7 Days       |       Graff     2-3 Days       |       Mr. Steam     2-3 Days  
    Architectural Mailboxes     2-3 Days       |       Hansgrohe     5-7 Days       |       Myson     2-3 Days  
    Atlas Homewares     5-7 Days       |       Herbeau     5-7 Days       |       Omnia     2-3 Days  
    Barclay     2-3 Days       |       Hickory Hardware     2-3 Days       |       Price Pfister     2-3 Days  
    Belle Foret     2-3 Days       |       Houzer     2-3 Days       |       Richelieu     2-3 Days  
    Belwith Keeler     2-3 Days       |       Huntington Brass     2-3 Days       |       RK International     2-3 Days  
    Cifial     Call       |       Isenberg     2-3 Days       |       Rohl     7-10 Days  
    Classic Brass     2-3 Days       |       Jaclo     2-3 Days       |       Ronbow     9-12 Days  
    Classic Hardware     2-3 Days       |       Jason     2-3 Days       |       Schaub     2-3 Days  
    Cole And Co     Call       |       Julien     7-10 Days       |       Smedbo     2-3 Days  
    Danze     5-7 Days       |       JVJ Hardware     5-7 Days       |       Soko     2-3 Days  
    Decolav     2-3 Days       |       Kingston Brass     2-3 Days       |       Taymor     5-7 Days  
    Dreamline     2-3 Days       |       Kohler     5-7 Days       |       ThermaSol     2-3 Days  
    Elements of Design     2-3 Days       |       KWC     2-3 Days       |       Thermique     5-7 Days