Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

Barclay Cast Iron Roll Top Tub With Base (with Holes) - White

Item SKU # Barclay CTDRHB-WH

$2,007.80

Availability: In stock

Product Information

  • Inside finish: White enamel
  • 7” deck holes
  • Tub comes in white (unless specified)
  • Non-skid strips
  • Tub and base combination ships on 1 pallet
  • Cutout in base for waste and overflow
  • L: 66 1/4”
  • L (Base): 50 1/2”
  • W: 30 3/4”
  • W (Base): 22”
  • H: 24 1/2” (from floor to top of tub)
  • H(Base): 7 1/2”

Product Specifications

Finish White
Color Whites
Material Cast Iron
Brand Barclay
Tub Shape Oval

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Write Your Own Review

You're reviewing: Barclay Cast Iron Roll Top Tub With Base (with Holes) - White

Estimate lead time for the following brands

Allied Brass     7 Days       |       Elkay USA     5-7 Days       |       LaToscana     2-3 Days  
Alno     2-3 Days       |       Empire Industries     5-7 Days       |       Laurey     2-3 Days  
Amba     2-3 Days       |       Emtek     5-7 Days       |       Lenova     2-3 Days  
Amerec     5-7 Days       |       Fluid     2-3 Days       |       Liberty Hardware     2-3 Days  
Amerock     2-3 Days       |       Franke     2-3 Days       |       Maax     10-20 Days  
Anne At Home     7-10 Days       |       Gatco     5-7 Days       |       Mico Designs     2-3 Days  
Aquabrass     5-7 Days       |       Geberit     5-7 Days       |       Mountain Plumbing     2-3 Days  
Aquadis     5-7 Days       |       Graff     2-3 Days       |       Mr. Steam     2-3 Days  
Architectural Mailboxes     2-3 Days       |       Hansgrohe     5-7 Days       |       Myson     2-3 Days  
Atlas Homewares     5-7 Days       |       Herbeau     5-7 Days       |       Omnia     2-3 Days  
Barclay     2-3 Days       |       Hickory Hardware     2-3 Days       |       Price Pfister     2-3 Days  
Belle Foret     2-3 Days       |       Houzer     2-3 Days       |       Richelieu     2-3 Days  
Belwith Keeler     2-3 Days       |       Huntington Brass     2-3 Days       |       RK International     2-3 Days  
Cifial     Call       |       Isenberg     2-3 Days       |       Rohl     7-10 Days  
Classic Brass     2-3 Days       |       Jaclo     2-3 Days       |       Ronbow     9-12 Days  
Classic Hardware     2-3 Days       |       Jason     2-3 Days       |       Schaub     2-3 Days  
Cole And Co     Call       |       Julien     7-10 Days       |       Smedbo     2-3 Days  
Danze     5-7 Days       |       JVJ Hardware     5-7 Days       |       Soko     2-3 Days  
Decolav     2-3 Days       |       Kingston Brass     2-3 Days       |       Taymor     5-7 Days  
Dreamline     2-3 Days       |       Kohler     5-7 Days       |       ThermaSol     2-3 Days  
Elements of Design     2-3 Days       |       KWC     2-3 Days       |       Thermique     5-7 Days