Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

    • Purchasing this item will earn you 1727 reward points (1727 Points $17.00) !
    • Applies only to registered customers, may vary when logged in.

Barclay 60" Cast Iron Roll Top Tub With 7" Deck Holes

Item SKU # Barclay CTR7H60-WH

$1,727.50

Availability: In stock

* Required Fields

$1,727.50
Request for Quote

 

Product Information

  • Inside finish: White enamel
  • Ball and Claw Feet available in 8 finishes or unfinished
  • Tub exterior available as Unfinished (gray primer) or White (epoxy)
  • Non-skid Strips
  • L: 60 3/4”
  • W: 30 1/2”
  • H: 23 1/4” (from floor to top of tub), 18 5/8” (from bottom of tub to top of tub)
  • Feet are attached and leveled before shipment
  • Extra Paint Charge (inside of tub is always white enamel): Bisque Paint - $160, Black Paint - $160
  • Tub is thoroughly inspected before shipment

Product Specifications

Material Cast Iron
Brand Barclay
Type Clawfoot Tubs
Tub Shape Oval

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     3-4 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     5-8 Business Days       |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Baldwin Estate     4 Weeks       |       Baldwin Reserve     7-10 Business Days  
Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days       |       Belle Foret     Call  
Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days       |       Belwith Keeler     2-3 Business Days  
Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days       |       Cifial     Call  
Isenberg     2-3 Business Days       |       Rohl     7-10 Business Days       |       Classic Brass     2-3 Business Days  
Jaclo     2-3 Business Days       |       Ronbow     2-3 Weeks       |       Classic Hardware     2-3 Business Days  
Jason     2-3 Business Days       |       Schaub     1-3 Business Days       |       Cole And Co     Call  
Julien     2-3 Weeks       |       Smedbo     2-10 Business Days       |       Danze     1-2 Weeks  
JVJ Hardware     5-7 Business Days       |       Soko     Call       |       Decolav     Call  
Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days       |       Dreamline     2-5 Days  
Kohler     1-2 Weeks       |       ThermaSol     2-3 Weeks       |       Elements of Design     7-10 Days  
KWC     7-10 Business Days       |       Thermique     3-4 Business Days  
-->