Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

    • Purchasing this item will earn you 380 reward points (380 Points $3.00) !
    • Applies only to registered customers, may vary when logged in.

Dreamline Visions 56 to 60" Frameless Sliding Tub Door, Clear 1/4" Glass Door

Item SKU # Dreamline SHDR-1160586

Price From: $380.80

Availability: In stock

* Required Fields

Price From:

 

Product Information

  • The Visions sliding tub door deliver a polished look with a frameless glass design and a unique four panel configuration. The two outer panels are stationary, while the two inner panels slide open to create a center point of entry, an excellent solution when traditional right or left opening doors prove to be an awkward choice.
  • 56 - 60" W x 58" H
  • 1/4 (6 mm)clear tempered glass
  • Frameless glass design
  • Width installation adjustability: 56 - 60"
  • Out-of-plumb installation adjustability: Up to 1" per side
  • Two sliding doors, flanked by two stationary panels
  • Anodized aluminum wall profiles and guide rails
  • Aluminum top and bottom guide rails may be shortened by cutting up to 4"
  • Door opening: 22 - 26"
  • Stationary panel: Two 12 3/4" panels
  • Material: Tempered Glass, Aluminum
  • Tempered glass ANSI certified

Product Specifications

Brand Dreamline
Width 60"
Height 58"
Collection Visions

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Write Your Own Review

You're reviewing: Dreamline Visions 56 to 60" Frameless Sliding Tub Door, Clear 1/4" Glass Door

Estimated Pre-Shipping Lead Time by Brand 

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.

Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     2-3 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     5-8 Business Days       |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days  
Belle Foret     Call       |       Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days  
Belwith Keeler     2-3 Business Days       |       Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days  
Cifial     Call       |       Isenberg     2-3 Business Days       |       Rohl     7-10 Days  
Classic Brass     2-3 Business Days       |       Jaclo     2-3 Business Days       |       Ronbow     9-12 Business Days  
Classic Hardware     2-3 Business Days       |       Jason     2-3 Business Days       |       Schaub     1-3 Business Days  
Cole And Co     Call       |       Julien     2-3 Weeks       |       Smedbo     2-10 Business Days  
Danze     1-2 Weeks       |       JVJ Hardware     5-7 Business Days       |       Soko     Call  
Decolav     Call       |       Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days  
Dreamline     2-5 Days       |       Kohler     1-2 Weeks       |       ThermaSol     3-7 Business Days  
Elements of Design     7-10 Days       |       KWC     3-7 Business Days       |       Thermique     3-4 Business Days