Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

    • Purchasing this item will earn you 211 reward points (211 Points $2.00) !
    • Applies only to registered customers, may vary when logged in.

Emtek Electronic Sandcast Bronze Keypad Leverset with Storeroom/Gate Function

Item SKU # Emtek E2201

$211.20

Availability: In stock

* Required Fields

$211.20

 

  • Call For Price

Product Information

  • Fits any door between 1 3/4" to 2 1/4" thick with a 2 1/8" bore standard door prep
  • Installs easily with only a Phillips head screwdriver
  • Easy to use installation and programming instructions included
  • Factory programmed with 2 unique, secure user codes for use right out of the box
  • Can be programmed with up to 20 user codes of your choice
  • Programming changes can be made easily using the keypad
  • Keypad has a protective coating to prevent wear patterns
  • Illuminated keypad for easy and quick operation after dark
  • Low battery indicator lets you know when it’s time to change the battery
  • Complete Set Includes Latch And Strike Plate
  • Standard Latch Is 2 3/8"Backset
  • Specify 2 3/4" If Requierd
  • Handing Required for Leversets
  • Keypad Leversets are compatible with levers only

Available Handles: Aurora Lever (AR), Cimarron Lever (CR), Cody Lever (CD), Durango Lever (D), Lariat Lever (LR), Montrose Lever (MT), Teton Lever (TT), Yuma Lever (YM)

Product Specifications

Brand Emtek
Type Electronic Locks
Function Keypad Entry

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     3-4 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     Call
      |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Baldwin Estate     4 Weeks       |       Baldwin Reserve     7-10 Business Days  
Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days       |       Belle Foret     Call  
Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days       |       Belwith Keeler     2-3 Business Days  
Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days       |       Cifial     10-12 Weeks
 
Isenberg     2-3 Business Days       |       Rohl     7-10 Business Days       |       Classic Brass     2-3 Business Days  
Jaclo     2-3 Business Days       |       Ronbow     2-3 Weeks       |       Classic Hardware     2-3 Business Days  
Jason     2-3 Business Days       |       Schaub     1-3 Business Days       |       Cole And Co     Call  
Julien     2-3 Weeks       |       Smedbo     2-10 Business Days       |       Danze     1-2 Weeks  
JVJ Hardware     5-7 Business Days       |       Soko     Call       |       Decolav     Call  
Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days       |       Dreamline     2-5 Days  
Kohler     1-2 Weeks       |       ThermaSol     2-3 Weeks       |       Elements of Design     7-10 Days  
KWC     7-10 Business Days       |       Thermique     3-4 Business Days