Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

    • Purchasing this item will earn you 217 reward points (217 Points $2.00) !
    • Applies only to registered customers, may vary when logged in.

Emtek Electronic EMTouch Brass Keypad Leverset

Item SKU # Emtek E4020

$217.60

Availability: In stock

* Required Fields

$217.60

 

  • Call For Price

Product Information

  • Programmed with 2 unique, secure user codes
  • Stored up to 20 user codes
  • Can be ordered with any Brass lever
  • Sold as complete set. Includes Latch and Strike Plate
  • Adaptors available for brass leverset to fit doors between 1-3/8" and 1-5/8" thick for additional charge
  • Passage Function in Locked Mode: 
    • Outside lever always locked
    • Entry by code or key only
    • Inside lever always free
  • Passage Function in Passage Mode: 
    • Outside lever always free
    • Entry by operating lever, no code or key required
    • Inside lever always free
  • Technical Specification:
  • Fits any door between 1-3/4" to 2-1/4" thick with a 2-1/8" bore standard door prep
  • Standard latch is 2-3/8" backset. Specify 2-3/4" backset if required Handing required for Leversets

Available Handles: Athena Lever (ATN), Aireon Lever (A), Basel Lever (BA), Geneva Lever (GV), Helios Lever (HLO), Hercules Lever (HEC), Hermes Lever (HER), Kiel Lever (KIE), Luzern Lever (LU), Mercury Lever (MC), Poseidon Lever (POS), Sion Lever (SIO), Stuttgart Lever (STU), Triton Lever (TRT), Cortina Lever (C), Coventry Lever (CV), Elan Lever (EN), Lafayette Brass Lever (LB), Milano Lever (M), Ribbon & Reed Lever (RBL), Rope Lever (RL), Rustic Lever (R), Santa Fe Lever (SF), Turino Lever (T), Wembley Lever (WM), Arts & Crafts Lever (AC), Hammered Lever (HM)

Product Specifications

Brand Emtek
Type Electronic Locks
Function Keypad Entry

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     3-4 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     5-8 Business Days       |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Baldwin Estate     4 Weeks       |       Baldwin Reserve     7-10 Business Days  
Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days       |       Belle Foret     Call  
Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days       |       Belwith Keeler     2-3 Business Days  
Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days       |       Cifial     10-12 Weeks
 
Isenberg     2-3 Business Days       |       Rohl     7-10 Business Days       |       Classic Brass     2-3 Business Days  
Jaclo     2-3 Business Days       |       Ronbow     2-3 Weeks       |       Classic Hardware     2-3 Business Days  
Jason     2-3 Business Days       |       Schaub     1-3 Business Days       |       Cole And Co     Call  
Julien     2-3 Weeks       |       Smedbo     2-10 Business Days       |       Danze     1-2 Weeks  
JVJ Hardware     5-7 Business Days       |       Soko     Call       |       Decolav     Call  
Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days       |       Dreamline     2-5 Days  
Kohler     1-2 Weeks       |       ThermaSol     2-3 Weeks       |       Elements of Design     7-10 Days  
KWC     7-10 Business Days       |       Thermique     3-4 Business Days