Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

    • Purchasing this item will earn you 259 reward points (259 Points $2.00) !
    • Applies only to registered customers, may vary when logged in.

Geberit Concealed Dual-Flush Technology Tank (UP320) System for Rear or Floor Outlet Toilet

Item SKU # Geberit 109.304.00.5

$259.08

Availability: In stock

Request for Quote

 

Product Information

  • Features & Specifications:
  • UP320 concealed dual-flush tank for washdown WC.
  • For installation of UP320 concealed flush tanks for floorstanding BTW washdown WC
  • For installation in wood or steel stud walls that provide support equal to 2"x 6" (5.5") depth
  • For dual flush
  • For room wall or preWall construction covered with panels (gypsum or wood)
  • For installation in front of a solid or drywall
  • For installation in room-height preWall or partition wall
  • For WC with dual flush low-consumption flushing volume of 1.6 / 0.8 GPF (6 / 3 LPF)
  • Water supply connection at centre back or at the top
  • Concealed cistern for tool-free mounting and repair work
  • Concealed cistern fully insulated against condensation
  • Fill valve flow rate at 7 psi (0.5 bar): 1.1 gpm (0.07 l/s)
  • Fill valve flow rate at 43 psi (3 bar): 3.0 gpm (0.19 l/s)
  • Flush volume: 1.6/0.8 GPF (6/3 LPF)
  • Fill valve operating pressure range: 1 - 145 psi (0.1 - 10 bar)
  • Fill valve max. fluid temp: 77 °F (25 °C)
  • Impuls380 fill valve
  • Fastening materia

Technical Specifications

Product Specifications

Finish White
Color Whites
Brand Geberit

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     3-4 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     5-8 Business Days       |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days  
Belle Foret     Call       |       Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days  
Belwith Keeler     2-3 Business Days       |       Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days  
Cifial     Call       |       Isenberg     2-3 Business Days       |       Rohl     7-10 Business Days  
Classic Brass     2-3 Business Days       |       Jaclo     2-3 Business Days       |       Ronbow     2-3 Weeks  
Classic Hardware     2-3 Business Days       |       Jason     2-3 Business Days       |       Schaub     1-3 Business Days  
Cole And Co     Call       |       Julien     2-3 Weeks       |       Smedbo     2-10 Business Days  
Danze     1-2 Weeks       |       JVJ Hardware     5-7 Business Days       |       Soko     Call  
Decolav     Call       |       Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days  
Dreamline     2-5 Days       |       Kohler     1-2 Weeks       |       ThermaSol     2-3 Weeks  
Elements of Design     7-10 Days       |       KWC     7-10 Business Days       |       Thermique     3-4 Business Days  
-->