Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

Mountain Plumbing Cable Operated Bath Waste And Overflow Kits

Item SKU # Mountain Plumbing BDR20S27-2

Price From: $102.05

Availability: In stock

* Required Fields

Price From:

 

Product Information

  • Description: Fill or drain with the control knob at the overflow! Complete 1-1/2? tubular bath drain with flexible, ABS-molded overflow neck, using metal components. Available in 9 plastic molded trim finishes and colors or 22 plated solid brass trim finishes. Iapmo Listed – Meets CSA Standard B125
  • Features:
  • Fits 23? to 27? depths
  • Can be cut to size by the installed IAPMO Listed
  • Cable length 39?
  • Available in Plastic Molded and Solid Brass Trim

Product Specifications

Brand Mountain Plumbing
Features Cable Operated

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Write Your Own Review

You're reviewing: Mountain Plumbing Cable Operated Bath Waste And Overflow Kits

Estimate lead time for the following brands

Allied Brass     7 Days       |       Elkay USA     5-7 Days       |       LaToscana     2-3 Days  
Alno     2-3 Days       |       Empire Industries     5-7 Days       |       Laurey     2-3 Days  
Amba     2-3 Days       |       Emtek     5-7 Days       |       Lenova     2-3 Days  
Amerec     5-7 Days       |       Fluid     2-3 Days       |       Liberty Hardware     2-3 Days  
Amerock     2-3 Days       |       Franke     2-3 Days       |       Maax     10-20 Days  
Anne At Home     7-10 Days       |       Gatco     5-7 Days       |       Mico Designs     2-3 Days  
Aquabrass     5-7 Days       |       Geberit     5-7 Days       |       Mountain Plumbing     2-3 Days  
Aquadis     5-7 Days       |       Graff     2-3 Days       |       Mr. Steam     2-3 Days  
Architectural Mailboxes     2-3 Days       |       Hansgrohe     5-7 Days       |       Myson     2-3 Days  
Atlas Homewares     5-7 Days       |       Herbeau     5-7 Days       |       Omnia     2-3 Days  
Barclay     2-3 Days       |       Hickory Hardware     2-3 Days       |       Price Pfister     2-3 Days  
Belle Foret     2-3 Days       |       Houzer     2-3 Days       |       Richelieu     2-3 Days  
Belwith Keeler     2-3 Days       |       Huntington Brass     2-3 Days       |       RK International     2-3 Days  
Cifial     Call       |       Isenberg     2-3 Days       |       Rohl     7-10 Days  
Classic Brass     2-3 Days       |       Jaclo     2-3 Days       |       Ronbow     9-12 Days  
Classic Hardware     2-3 Days       |       Jason     2-3 Days       |       Schaub     2-3 Days  
Cole And Co     Call       |       Julien     7-10 Days       |       Smedbo     2-3 Days  
Danze     5-7 Days       |       JVJ Hardware     5-7 Days       |       Soko     2-3 Days  
Decolav     2-3 Days       |       Kingston Brass     2-3 Days       |       Taymor     5-7 Days  
Dreamline     2-3 Days       |       Kohler     5-7 Days       |       ThermaSol     2-3 Days  
Elements of Design     2-3 Days       |       KWC     2-3 Days       |       Thermique     5-7 Days