Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

 

    • Purchasing this item will earn you 2200 reward points (2200 Points $22.00) !
    • Applies only to registered customers, may vary when logged in.

Mr. Steam ASME Code Blowdown Tank For Generator Modes CU360-3000

Item SKU # Mr Steam CU-BDT-ASME36

$2,200.00

Availability: In stock

Request for Quote

 

Product Information

  • Mr.Steam generators meet cULus and ASME requirements for low-pressure operation - adherence to Code and quality standards for outstanding durability and safety.
  • Specifications:
  • Total Room Volume: 2501-3000
  • PH: 3
  • KW: 72
  • Ship Weight: 320 lbs.
  • All CU Commercial Steambath Generators are available in 208/3, 240/3 and 480/3 and other Voltage/Phase combinations.
  • Only models CU360-CU1000 are available in 208/1 and 240/1 as priced. Specify Voltage/Phase when ordering.
  • Models CU360-CU1400 include Stainless Steel jacket
  • Important: When specifying a CU Commercial Steam bath Generator, the following is strongly recommended for best performance and user satisfaction:
  • One (1) CU steambath generator should service no more than two (2) steamrooms, each relatively similar in size and construction.
  • If two (2) steamrooms are serviced by one (1) CU generator, the combined resultant room volume of the two (2) rooms should not exceed 1000 cubic feet (28.3 cubic meters).
  • Each room must be operated with the appropriate F1 PLUS® temperature control system, inclusive of the room operating temperature control and the high-limit temperature control.
  • In all installations, the purchaser and/or owner/operator must consult with a designer, architect, and or consultant to assure the proper specification of the steambath generator and required and optional operating equipment.
  • Shown Image is model # CU1000

Technical Specifications

Product Specifications

Finish No Finish
Brand Mr. Steam
Collection Commercial

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     3-4 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     5-8 Business Days       |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days  
Belle Foret     Call       |       Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days  
Belwith Keeler     2-3 Business Days       |       Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days  
Cifial     Call       |       Isenberg     2-3 Business Days       |       Rohl     7-10 Business Days  
Classic Brass     2-3 Business Days       |       Jaclo     2-3 Business Days       |       Ronbow     2-3 Weeks  
Classic Hardware     2-3 Business Days       |       Jason     2-3 Business Days       |       Schaub     1-3 Business Days  
Cole And Co     Call       |       Julien     2-3 Weeks       |       Smedbo     2-10 Business Days  
Danze     1-2 Weeks       |       JVJ Hardware     5-7 Business Days       |       Soko     Call  
Decolav     Call       |       Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days  
Dreamline     2-5 Days       |       Kohler     1-2 Weeks       |       ThermaSol     2-3 Weeks  
Elements of Design     7-10 Days       |       KWC     7-10 Business Days       |       Thermique     3-4 Business Days  
-->