Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

    • Purchasing this item will earn you 665 reward points (665 Points $6.00) !
    • Applies only to registered customers, may vary when logged in.

Toto Vespin Close Coupled Elongated Toilet - 1.6 GPF

Item SKU # Toto CST764S

$665.15

Availability: In stock

* Required Fields

Product Information

  • Contemporary design, close coupled toilet
  • Skirted styling with concealed trapway for easy cleaning
  • G-Max® Flushing System: Quiet, powerful, commercial grade flushing performance
  • UniFit Rough-in: Easy to install 12" UniFit rough-in. 10" and 14" rough-ins also available
  • Upgrade with a SoftClose® seat, or a Washlet®
  • Fast Flush: Wide 3" flush valve is 125% larger than conventional 2" flush valves
  • Wider, 2 1/8" computer designed, fully glazed trapway
  • Large water surface
  • High profile elongated close coupled toilet with 12" UniFit rough-in. Low consumption (6 Lpf/1.6 Gpf) siphon jet flushing action.
  • Tank with lid, fittings, color matched trip lever, mounting covers, less seat.
  • Specifications:
  • Material: Vitreous China
  • Configuration: 2 Piece
  • Installation Type: Floor Mounted
  • Bowl Shape: Elongated
  • Flush Type: Gravity
  • Gallons Per Flush (GPF): 1.6 GPF
  • Bowl Height: 15"
  • Bowl Width: 14"
  • Tank Width: 19-3/4"
  • Overall Height: 28-7/8"
  • Depth: 28"

Product Specifications

Material Vitreous China
Collection Vespin
Brand Toto
Installation Type Floor Mounted
Height 15"

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Write Your Own Review

You're reviewing: Toto Vespin Close Coupled Elongated Toilet - 1.6 GPF

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     2-3 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     5-8 Business Days       |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days  
Belle Foret     Call       |       Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days  
Belwith Keeler     2-3 Business Days       |       Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days  
Cifial     Call       |       Isenberg     2-3 Business Days       |       Rohl     7-10 Business Days  
Classic Brass     2-3 Business Days       |       Jaclo     2-3 Business Days       |       Ronbow     2-3 Weeks  
Classic Hardware     2-3 Business Days       |       Jason     2-3 Business Days       |       Schaub     1-3 Business Days  
Cole And Co     Call       |       Julien     2-3 Weeks       |       Smedbo     2-10 Business Days  
Danze     1-2 Weeks       |       JVJ Hardware     5-7 Business Days       |       Soko     Call  
Decolav     Call       |       Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days  
Dreamline     2-5 Days       |       Kohler     1-2 Weeks       |       ThermaSol     2-3 Weeks  
Elements of Design     7-10 Days       |       KWC     3-7 Business Days       |       Thermique     3-4 Business Days  
-->