Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

    • Purchasing this item will earn you 923 reward points (923 Points $9.00) !
    • Applies only to registered customers, may vary when logged in.

Toto Lloyd One Piece Elongated High Profile Skirted Toilet - 1.6 GPF - ADA

Item SKU # Toto MS934214SF

$923.85

Availability: In stock

* Required Fields

Product Information

  • Unique sculpted design, skirted one piece toilet
  • Designer Lloyd® Suite: Matching air bath, pedestal and console lavatories
  • Universal height for maximum comfort: 16-1/8" rim height
  • Skirted styling with concealed trapway for easy cleaning
  • G-Max® Flushing System
  • Powerful, quiet flush every time
  • Large water surface
  • ADA Compliant
  • Fast Flush: Wide 3" flush valve is 125% larger than conventional 2" flush valves
  • Decorative, ADA compliant, high profile one piece toilet. Low consumption (6 Lpf/1.6 Gpf) siphon jet flushing action.
  • Tank cover, fittings, chrome plated trip lever, and Soiree® SoftClose® seat included.
  • Specifications:
  • Material: Vitreous China
  • Configuration: 1 Piece
  • Installation Type: Floor Mounted
  • Bowl Shape: Elongated
  • Flush Type: Gravity
  • Gallons Per Flush (GPF): 1.6 GPF
  • Bowl Height: 16-1/8"
  • Bowl Width: 14"
  • Tank Width: 18-5/8"
  • Overall Height: 27-1/2"
  • Depth: 28-1/8"

Product Specifications

Material Vitreous China
Collection Lloyd
Brand Toto
Installation Type Floor Mounted
Height 16-1/8"

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.

Write Your Own Review

You're reviewing: Toto Lloyd One Piece Elongated High Profile Skirted Toilet - 1.6 GPF - ADA

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     2-3 Business Days       |       Franke     2-8 Business Days       |       Maax     2-3 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     5-8 Business Days       |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days  
Belle Foret     Call       |       Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days  
Belwith Keeler     2-3 Business Days       |       Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days  
Cifial     Call       |       Isenberg     2-3 Business Days       |       Rohl     7-10 Days  
Classic Brass     2-3 Business Days       |       Jaclo     2-3 Business Days       |       Ronbow     9-12 Business Days  
Classic Hardware     2-3 Business Days       |       Jason     2-3 Business Days       |       Schaub     1-3 Business Days  
Cole And Co     Call       |       Julien     2-3 Weeks       |       Smedbo     2-10 Business Days  
Danze     1-2 Weeks       |       JVJ Hardware     5-7 Business Days       |       Soko     Call  
Decolav     Call       |       Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days  
Dreamline     2-5 Days       |       Kohler     1-2 Weeks       |       ThermaSol     3-7 Business Days  
Elements of Design     7-10 Days       |       KWC     3-7 Business Days       |       Thermique     3-4 Business Days  
-->