Free Shipping

on orders over $99.99

Call us

(866) 239-8399

(718) 977-5005

 

    • Purchasing this item will earn you 190 reward points (190 Points $1.00) !
    • Applies only to registered customers, may vary when logged in.

Kingston Silver Sage Collection 8" Deck Mount Kitchen Faucet with Brass Sprayer - Polished Brass

Item SKU # Kingston Brass KS2792ZLBS

$190.77

Availability: In stock

Request for Quote

 

Product Information

  • Adopted from the traditional styles of the early 20th century, the Silver Sage collection combines stylish curves and sleek elements by blending the contemporary design from the traditional look. The faucet has a double handle deck mount setup and features a 8" - 16" widespread arrangement. The body is fabricated from solid brass for durability and long-lasting use. The color finish is made of polished brass for that golden reflective shine, as well as resisting scratches, corrosion and tarnishing. The spout rotates 360 degrees for accessibility and convenience. The handle acts as a 1/4-turn on/off water control mechanism for easy management of water volume and temperature.  The faucet operates with a ceramic disc valve for droplet-free functionality with the water measured 2.2 GPM (8.3 LPM) and a 60 PSI maximum rate.  An integrated removable aerator is inserted beneath the spout's head piece for conserving water flow. A 10-year limited warranty is provided to the original consumer. Brass sprayer concluded.
  • Brass Sprayer Included
  • Polished Brass Finish
  • Metal Lever Handle
  • 8 1/4" Spout Projection with a 6-7/8"  spout clearance
  • 4 Hole Installation

Product Specifications

Finish Polished Brass
Color Brass Tones
Material Brass
Collection Silver Sage
Brand Kingston Brass

Estimated Pre-Shipping Lead Time by Brand

Transit Time is 1-5 Business Days for Ground Shipping, and 2-7 Business Days for Freight Shipping.
Allied Brass     2-6 Weeks       |       Elkay USA     3-7 Business Days       |       LaToscana     2-3 Business Days  
Alno     1-3 Business Days       |       Empire Industries     3-7 Business Days       |       Laurey     2-3 Business Days  
Amba     1-3 Business Days       |       Emtek     5-7 Business Days       |       Lenova     2-3 Business Days  
Amerec     1-2 Weeks       |       Fluid     Call       |       Liberty Hardware     2-3 Business Days  
Amerock     3-4 Business Days       |       Franke     2-8 Business Days       |       Maax     4-5 Weeks  
Anne At Home     2-3 Weeks       |       Gatco     7-12 Business Days       |       Mico Designs     2-5 Business Days  
Aquabrass     Call
      |       Geberit     1-2 Weeks       |       Mountain Plumbing     2-3 Business Days  
Aquadis     1-3 Weeks       |       Graff     3-7 Business Days       |       Mr. Steam     2-5 Business Days  
Architectural Mailboxes     2-3 Business Days       |       Hansgrohe     1-2 Weeks       |       Myson     Call  
Atlas Homewares     7-10 Business Days       |       Herbeau     Call       |       Omnia     3-7 Business Days  
Barclay     2-3 Business Days       |       Baldwin Estate     4 Weeks       |       Baldwin Reserve     7-10 Business Days  
Hickory Hardware     2-3 Business Days       |       Price Pfister     2-5 Business Days       |       Belle Foret     Call  
Houzer     2-4 Business Days       |       Richelieu     2-3 Business Days       |       Belwith Keeler     2-3 Business Days  
Huntington Brass     2-4 Business Days       |       RK International     2-3 Business Days       |       Cifial     10-12 Weeks
 
Isenberg     2-3 Business Days       |       Rohl     7-10 Business Days       |       Classic Brass     2-3 Business Days  
Jaclo     2-3 Business Days       |       Ronbow     2-3 Weeks       |       Classic Hardware     2-3 Business Days  
Jason     2-3 Business Days       |       Schaub     1-3 Business Days       |       Cole And Co     Call  
Julien     2-3 Weeks       |       Smedbo     2-10 Business Days       |       Danze     1-2 Weeks  
JVJ Hardware     5-7 Business Days       |       Soko     Call       |       Decolav     Call  
Kingston Brass     7-10 Business Days       |       Taymor     3-10 Business Days       |       Dreamline     2-5 Days  
Kohler     1-2 Weeks       |       ThermaSol     2-3 Weeks       |       Elements of Design     7-10 Days  
KWC     7-10 Business Days       |       Thermique     3-4 Business Days       |       Moen     2-3 Weeks  
Brizo     2-3 Weeks       |                 |